Reports:
+ Give written documentation
of:
The overall condition
of all venting devices on the storage tank.
Vent manufacturer, model
number, and serial number.
Tagging information --set
pressure and set vacuum.
Total weight of a pallet
and loading weight.
Calculated set pressure
and vacuum.
Materials of Construction.
Recommended repairs, replacements
or future inspections.
+ Establish computer trends for preventive maintenance scheduling.
|
Services:
Determine
the cleaning, inspection, calibration, and repair frequency required.
Verify proper
vent sizing for current conditions.
Insure that all
venting devices are tabulated to suggest possible future repair
activities and scheduling.
Joint effort
to organize and establish a preventive maintenance program.
Documentation
gives a snap-shot in time of the total storage tank situation.
Helps establishing
a permanent vent registration program. |